Skip to content
English - Australia
  • There are no suggestions because the search field is empty.

Flotation - Circuit

Flotation – CircuitEntry Guide

1. Login and Navigate to Flotation –  Circuit

  1. Login into Optimum and navigate to the Data Portal.
  2. Under Data Portal, click Shift Logs and expand the Flotation section.
  3. Click Flotation –  Circuit to open the data entry form.

2. Selecting the Shift to Enter

Under Select Data Period, choose the shift you want to enter.

Shift Status Types:

  • Not Entered – No data saved
  • Unconfirmed – Data saved but not confirmed
  • Confirmed – Finalised and locked

3. Entering  Circuit Data

Enter the values for the following for the hourly timestamp 

  • Rougher-Scavenger Stage 2
  • SU-010 Discharge
  • Divert CST to
  • Polsihing Mill Product to
  • Column 1/2
  • Regrind Mill Product to
  • Column 3/4
  • First Cleaner
  • Third Cleaner Concentrate

4. Save Entry
  • Click Save at the bottom of the form to store the shift entry.
  • Once saved, the shift becomes Unconfirmed.
5. Confirm Entry
  • After saving, you may confirm the entry if you have the required access.
  • Confirming locks the shift — no further changes can be made unless it is unconfirmed first.
6. Unconfirm Entry
  • Click Unconfirm if you need to edit a confirmed entry (access‑dependent).
7. Delete Entry
  • Deletes the shift entry (only available to authorised users).