Grinding - Total Production
Grinding – Total Production Entry Guide

1. Login and Navigate to Grinding – Total Production
- Login into Optimum and navigate to the Data Portal.
- Under Data Portal, click Shift Logs and expand the Grinding section.
- Click Grinding – Total Production to open the data entry form.
Under Select Data Period, choose the shift you want to enter.
Shift Status Types:
- Not Entered – No data saved
- Unconfirmed – Data saved but not confirmed
- Confirmed – Finalised and locked
3. Entering Total Production Data
Enter the Totalizer Value for LIne-1 and Line-2
4. Save Entry- Click Save at the bottom of the form to store the shift entry.
- Once saved, the shift becomes Unconfirmed.
- After saving, you may confirm the entry if you have the required access.
- Confirming locks the shift — no further changes can be made unless it is unconfirmed first.
- Click Unconfirm if you need to edit a confirmed entry (access‑dependent).
- Deletes the shift entry (only available to authorised users).