Skip to content
English - Australia
  • There are no suggestions because the search field is empty.

Crusher - Restriction Primary Crusher 1

Crusher – Restriction Primary Crusher 1 Entry Guide

1. Login and Navigate to Crusher–  Restriction Primary Crusher 1 

  1. Login into Optimum and navigate to the Data Portal.
  2. Under Data Portal, click Shift Logs and expand the Crusher section.
  3. Click Crusher –Restriction Primary Crusher 1  to open the data entry form.

2. Selecting the Shift to Enter

Under Select Data Period, choose the shift you want to enter.

Shift Status Types:

  • Not Entered – No data saved
  • Unconfirmed – Data saved but not confirmed
  • Confirmed – Finalised and locked

3. Entering  Restriction Primary Crusher 1  Information

Enter x as a valid input for each timestamp as required for the following

  • Low Mine Ore Supply
  • Ore Condition
  • Crusher High Power
  • Crusher Down
  • Downstream Equipment Down
  • Mantle Profile Issue
  • Surgepile Level High
  • Stockpile Level High
  • Running Normal

Enter Shift Comments if there is any comment to be made for the shift regarding restriction for Primary Crusher 1

4. Save Entry
  • Click Save at the bottom of the form to store the shift entry.
  • Once saved, the shift becomes Unconfirmed.
5. Confirm Entry
  • After saving, you may confirm the entry if you have the required access.
  • Confirming locks the shift — no further changes can be made unless it is unconfirmed first.
6. Unconfirm Entry
  • Click Unconfirm if you need to edit a confirmed entry (access‑dependent).
7. Delete Entry
  • Deletes the shift entry (only available to authorised users).