Crusher - Mine To Crusher
Crusher – Mine To Crusher Entry Guide

1. Login and Navigate to Crusher– Mine to Crusher
- Login into Optimum and navigate to the Data Portal.
- Under Data Portal, click Shift Logs and expand the Crusher section.
- Click Crusher – Mine To Crusher to open the data entry form.
Under Select Data Period, choose the shift you want to enter.
Shift Status Types:
- Not Entered – No data saved
- Unconfirmed – Data saved but not confirmed
- Confirmed – Finalised and locked
3. Entering Mine To Crusher Information
Enter the values for the following
-
Mine To Crusher Target
-
Target
-
Actual
-
- Mine to Crusher Activities(Minutes)
- Blasting
- Praying
- Other
-
Mill
- Total Throughput
- % Cu Average
- % Float Cu Rec
- Stockpile Level
- Start Shift (Low/Ok/High)
- End Shift (Low/Ok/High)
- Excavator
- Run Hours
- Reason for Excavator Run Hours
- Click Save at the bottom of the form to store the shift entry.
- Once saved, the shift becomes Unconfirmed.
- After saving, you may confirm the entry if you have the required access.
- Confirming locks the shift — no further changes can be made unless it is unconfirmed first.
- Click Unconfirm if you need to edit a confirmed entry (access‑dependent).
- Deletes the shift entry (only available to authorised users).