Skip to content
English - Australia
  • There are no suggestions because the search field is empty.

Crusher - Downtime

Crusher – Downtime Entry Guide

1. Login and Navigate to Crusher–  Downtime 

  1. Login into Optimum and navigate to the Data Portal.
  2. Under Data Portal, click Shift Logs and expand the Crusher section.
  3. Click Crusher –  Downtime  to open the data entry form.

2. Selecting the Shift to Enter

Under Select Data Period, choose the shift you want to enter.

Shift Status Types:

  • Not Entered – No data saved
  • Unconfirmed – Data saved but not confirmed
  • Confirmed – Finalised and locked

3. Entering Downtime Data

Enter downtime Data in each row as required for the fields below:

  • Stop : Enter time in the format(hh:mm) it is the time when the equipment stopped
  • Start : Enter time in the format(hh:mm) it is the time when the equipment started again
  • Ton/h
  • Status
  • Planned
  • Equipment
  • Section
  • Keyword
  • Description
  • What/Action
  • Type
  • Asset Per

Note: Start Time in each row should be after the Stop Time

4. Save Entry

  • Click Save at the bottom of the form to store the shift entry.
  • Once saved, the shift becomes Unconfirmed.
5. Confirm Entry
  • After saving, you may confirm the entry if you have the required access.
  • Confirming locks the shift — no further changes can be made unless it is unconfirmed first.
6. Unconfirm Entry
  • Click Unconfirm if you need to edit a confirmed entry (access‑dependent).
7. Delete Entry
  • Deletes the shift entry (only available to authorised users).