How much does the system cost?
How much does the system cost?
How much does the system cost?
The cost of FixedPlantIQ depends on several factors including plant size, number of operational measurements, deployment model, and licensing requirements.
Most implementations include two primary cost components. The first is the software licensing cost, which is based on concurrent user access and system configuration. The second component is implementation services, which vary depending on the deployment model selected and the level of implementation support required.
Because every plant environment is different, pricing is usually determined after a short discussion to understand the operational scope and implementation requirements. This allows the implementation approach and licensing model to be aligned with the needs of the site.