CCD-Process Water

1. Login and Navigate to CCD – Shift Information

  1. Login into Optimum and navigate to the Data Portal.
  2. Under Data Portal, click Shift Logs and expand the CCD section.
  3. Click CCD – Process Water to open the data entry form.

2. Selecting the Shift to Enter

Under Select Data Period, choose the shift you want to enter.

Shift Status Types:

  • Not Entered – No data saved
  • Unconfirmed – Data saved but not confirmed
  • Confirmed – Finalised and locked

3. Entering Process Water Data

This has two section of data as below

  • For the Swiss Pump Run please put a 'x' if the pump is running

      Enter the numeric values for other parametes below.

  • Process Water Level(%)
    •  TK04
    • TK05
  • Storm Water Pond
    • Level(%)
    • Total Pump
  • Santong 
    • Pond Level(m)
    • Flow Rate Avg.(m3/hr)
    • Total Hour Supply
    • pH
    • Cu(ppm)
    • Mn(ppm)

 4. Save Entry

  • Click Save at the bottom of the form to store the shift entry.
  • Once saved, the shift becomes Unconfirmed.

5. Confirm Entry

  • After saving, you may confirm the entry if you have the required access.
  • Confirming locks the shift — no further changes can be made unless it is unconfirmed first.

6. Unconfirm Entry

  • Click Unconfirm if you need to edit a confirmed entry (access‑dependent).

7. Delete Entry

  • Deletes the shift entry (only available to authorised users).